COMMERCIAL | 45 kW

RMZ Ecowork required to generate solar power sufficient for supporting the entire building and campus. Kaval Power installed 200 kWp solar power system which generates 292000 units of electricity annually.

Project Details

Total Electricity Generation from Solar power plant

64,800 units

Annual Generation

16,20,000 units

Lifetime Generation (25 Year):

Financial Savings

Tariff

(for top slab of tariff):

No increase assumed for 25 years

@ 10/ kWh

29,20,000/-

Annually in Rupees

Contribution to Environment

6160 Tonnes

Carbon Dioxide Emissions Mitigated

9820 Teak trees

This Installation will be equivalent to planting teak trees over the life time.