Shri Pashupathi Granites – Nanjangood

INDUSTRIAL | 105 kW

Shri Pashupathi Granites required to generate solar power sufficient for its entire industrial unit. Kaval Power installed a 105 kWp solar power system which generates 3,02,400 units of electricity annually.

Project Details

Total Electricity Generation from Solar power plant

1,53,300 units

Annual Generation

38,32,500 units

Lifetime Generation (25 Year):

Financial Savings

Tariff

(for top slab of tariff):

No increase assumed for 25 years

@ 9/ kWh

13,79,700/-

Annually in Rupees

3234 Tonnes

Carbon Dioxide Emissions Mitigated

5155 Teak trees

This Installation will be equivalent to planting teak trees over the life time.

Contribution to Environment

Disclaimer: The calculation is indicative in nature. Generation may vary from location to location