top of page

IMPEX Granite

INDUSTRIAL | 210 kW

210 kW Project at Impex Granite & Marble, Thandya Industrial Area, Mysore 2021

Project Details

Total Electricity Generation from Solar power plant

3,02,400 units

Annual Generation

75,60,000 units

Lifetime Generation (25 Year):

Financial Savings

Tariff

(for top slab of tariff):

No increase assumed for 25 years

@ 9.3/ kWh

28,12,320/-

Annually in Rupees

6468 tonnes

Carbon Dioxide Emissions Mitigated

10311 teak trees

This Installation will be equivalent to planting teak trees over the life time.

Contribution to Environment

Disclaimer: The calculation is indicative in nature. Generation may vary from location to location

Project Gallery

bottom of page